RENEWABLE ENERGY

1. Gujarat Solar Power Policy (2021)

  • Operative Period: 2021 to 2025 (5 years).
  • Eligibility Criteria:
    • Developers, individuals, and companies interested in setting up solar power projects.
    • Projects must comply with technical and environmental standards.
  • Subsidy Details:
    • Capital Subsidy: Up to 40% subsidy for rooftop solar projects (residential, institutional, and social sectors).
    • Land Allocation: Land provided at concessional rates for solar projects.
    • Wheeling Charges: Reduced charges for solar power evacuation.
    • Net Metering: Available for rooftop solar installations.

2. Gujarat Wind Power Policy (2016)

  • Operative Period: 2016 to 2021 (extended as per state government notifications).
  • Eligibility Criteria:
    • Wind energy developers and investors.
    • Projects must meet technical and environmental standards.
  • Subsidy Details:
    • Land Allocation: Land provided at concessional rates for wind farms.
    • Transmission Infrastructure: State support for developing evacuation infrastructure.
    • Tax Exemptions: Exemptions on electricity duty and other taxes.

3. Surya Gujarat Scheme (Rooftop Solar)

  • Operative Period: Ongoing (since 2019).
  • Eligibility Criteria:
    • Residential, commercial, industrial, and institutional consumers.
    • Installers must be empaneled with the Gujarat Energy Development Agency (GEDA).
  • Subsidy Details:
    • Residential Consumers: Up to 40% subsidy for systems up to 3 kW and 20% subsidy for systems between 3 kW and 10 kW.
    • Institutional Consumers: Up to 70% subsidy for government schools, hospitals, and other institutions.
    • Net Metering: Available for all eligible consumers.

4. Kisan Urja Suraksha evam Utthaan Mahabhiyan (KUSUM) Scheme

  • Operative Period: 2019 to 2022 (extended as per central government notifications).
  • Eligibility Criteria:
    • Farmers with agricultural land.
    • Developers for grid-connected solar power plants.
  • Subsidy Details:
    • Solar Pumps: Up to 60% subsidy (30% central government, 30% state government, and 30% farmer contribution).
    • Grid-Connected Solar Plants: Subsidy for setting up small solar power plants on barren land.

5. Gujarat Hybrid Renewable Energy Policy (2018)

  • Operative Period: 2018 to 2023 (5 years).
  • Eligibility Criteria:
    • Developers and companies interested in hybrid renewable energy projects (solar + wind or other combinations).
    • Projects must meet technical and environmental standards.
  • Subsidy Details:
    • Land Allocation: Land provided at concessional rates.
    • Transmission Infrastructure: State support for developing evacuation infrastructure.
    • Tax Exemptions: Exemptions on electricity duty and other taxes.

6. Renewable Energy Park in Kutch

  • Operative Period: Ongoing (since 2020).
  • Eligibility Criteria:
    • Developers and companies interested in setting up solar and wind energy projects.
    • Projects must comply with technical and environmental standards.
  • Subsidy Details:
    • Land Allocation: Land provided at concessional rates.
    • Infrastructure Development: State support for developing transmission infrastructure.

7. Gujarat State Renewable Energy Development Agency (GSEDA) Incentives

  • Operative Period: Ongoing.
  • Eligibility Criteria:
    • Renewable energy developers, individuals, and companies.
    • Projects must align with state renewable energy goals.
  • Subsidy Details:
    • Capital Subsidy: Up to 30-40% subsidy for specific renewable energy projects.
    • Training and Skill Development: Financial support for training programs in the renewable energy sector.