1. Gujarat Solar Power Policy (2021)
- Operative Period: 2021 to 2025 (5 years).
- Eligibility Criteria:
- Developers, individuals, and companies interested in setting up solar power projects.
- Projects must comply with technical and environmental standards.
- Subsidy Details:
- Capital Subsidy: Up to 40% subsidy for rooftop solar projects (residential, institutional, and social sectors).
- Land Allocation: Land provided at concessional rates for solar projects.
- Wheeling Charges: Reduced charges for solar power evacuation.
- Net Metering: Available for rooftop solar installations.
2. Gujarat Wind Power Policy (2016)
- Operative Period: 2016 to 2021 (extended as per state government notifications).
- Eligibility Criteria:
- Wind energy developers and investors.
- Projects must meet technical and environmental standards.
- Subsidy Details:
- Land Allocation: Land provided at concessional rates for wind farms.
- Transmission Infrastructure: State support for developing evacuation infrastructure.
- Tax Exemptions: Exemptions on electricity duty and other taxes.
3. Surya Gujarat Scheme (Rooftop Solar)
- Operative Period: Ongoing (since 2019).
- Eligibility Criteria:
- Residential, commercial, industrial, and institutional consumers.
- Installers must be empaneled with the Gujarat Energy Development Agency (GEDA).
- Subsidy Details:
- Residential Consumers: Up to 40% subsidy for systems up to 3 kW and 20% subsidy for systems between 3 kW and 10 kW.
- Institutional Consumers: Up to 70% subsidy for government schools, hospitals, and other institutions.
- Net Metering: Available for all eligible consumers.
4. Kisan Urja Suraksha evam Utthaan Mahabhiyan (KUSUM) Scheme
- Operative Period: 2019 to 2022 (extended as per central government notifications).
- Eligibility Criteria:
- Farmers with agricultural land.
- Developers for grid-connected solar power plants.
- Subsidy Details:
- Solar Pumps: Up to 60% subsidy (30% central government, 30% state government, and 30% farmer contribution).
- Grid-Connected Solar Plants: Subsidy for setting up small solar power plants on barren land.
5. Gujarat Hybrid Renewable Energy Policy (2018)
- Operative Period: 2018 to 2023 (5 years).
- Eligibility Criteria:
- Developers and companies interested in hybrid renewable energy projects (solar + wind or other combinations).
- Projects must meet technical and environmental standards.
- Subsidy Details:
- Land Allocation: Land provided at concessional rates.
- Transmission Infrastructure: State support for developing evacuation infrastructure.
- Tax Exemptions: Exemptions on electricity duty and other taxes.
6. Renewable Energy Park in Kutch
- Operative Period: Ongoing (since 2020).
- Eligibility Criteria:
- Developers and companies interested in setting up solar and wind energy projects.
- Projects must comply with technical and environmental standards.
- Subsidy Details:
- Land Allocation: Land provided at concessional rates.
- Infrastructure Development: State support for developing transmission infrastructure.
7. Gujarat State Renewable Energy Development Agency (GSEDA) Incentives
- Operative Period: Ongoing.
- Eligibility Criteria:
- Renewable energy developers, individuals, and companies.
- Projects must align with state renewable energy goals.
- Subsidy Details:
- Capital Subsidy: Up to 30-40% subsidy for specific renewable energy projects.
- Training and Skill Development: Financial support for training programs in the renewable energy sector.